Drilling and Solar Reticulation of High-Yield Borehole at Waitaluk Market
8-Point Project Transparency Profile
Public transparency index answering the 8 core citizen accountability dimensions mandated by Section 23 of the NG-CDF platform guidelines.
Project Description & Scope of Works
150-metre geophysical borehole drilling, test pumping, solar-powered submersible pump installation, 20,000-litre elevated storage tank, and community water kiosk.
Bill of Quantities (BQ) Summary
Geological Survey & Hydro Drilling: KES 2.5M, Solar Pumping Unit: KES 1.8M, Steel Tower & Tank: KES 1.2M
Construction Milestones & Civil Works Schedule
Visual Site Documentation Timeline
Site photographs being compiled by the M&E field team.
Project Statutory Documents & BOQs
No official engineering drawings or BOQ files uploaded for this project yet.
Field Monitoring & Inspection Reports
Execution Challenges & Mitigation Actions
No active contractual or physical execution bottlenecks logged for this project.